SCREED X Rapid Engineered Screed 20 kg

Pre-blended engineered screed. Just add water. Walk on it in 2–3 hours, tile from 12, and lay membrane or vinyl at 24 hours once it is under 4% moisture. 30 MPa, 10–100 mm, inside or out.

30MPa28-day strength
<4%Moisture at 24 h
12hTile from
10–100mmThickness
$24.00
In stock, ready to dispatch
Per 20 kg bag, inc. GST. 50 bags to a pallet. Not sure how many? Use the calculator.
200 kg · about 1.2 m² at 100 mm or 12 m² at 10 mm
Build the kit

Frequently bought together

Total
10-year FORSPEC product warrantyExpert advice: (02) 8021 3517Pallets delivered Australia wideMethod, TDS and SDS one tap away
Watch it · engineered screed explained

Mix it, lay it, compact it, float it, tile it tomorrow

Why site-mixed screeds fail, how SCREED X is different, and every step from the data sheet: prep, mixing ratio, compaction, joints, cure times and the watch-outs.

Build the kit
Bag calculator

How many bags do you need?

Build-up
m²
mm
Allow for waste

Allows 20 kg per m² for every 10 mm: one bag covers about 1 m² at 10 mm, or 4 bags per m² at 40 mm. That is the compacted rate for a 5 : 1 semi-dry screed, a little above the data sheet's 16–18 kg, so you won't run short.

40 SLAB · BOND SLURRY
0bags of SCREED X
Weight0 kg
Pallets0
Screed cost$0
Per bag here0 m²
Build the kit
Build your kit

Everything else for the job

Your bags from the calculator are already in. Tick the rest and add it all in one go.

The screed

Bond & prime
Reinforce & joints
Mix
Lay & finish
Safety
Why engineered screed

The screed is the floor under the floor

A site mix is only as good as the shovel count and the hose. An engineered screed is batched in a factory, so the strength, drying time and thickness rules are known before you start.

Site mixSand + cementSCREED XEngineered, pre-blended
MixGuessed on siteFactory 5 : 1
WaterWhatever works1.2–1.4 L per 20 kg
StrengthUntested30 MPa (C30), 5 MPa flexural (F5)
Foot trafficNext day or later2–3 hours
TileDays to weeksFrom 12 hours
Membrane / vinylWeeks, wait for it to dryUnder 4% at 24 hours
ThicknessVaries10–100 mm, rules on the TDS
Engineer / certifierHard to justifyPublished TDS, AS 3958.1
Every bagDifferentThe same

SCREED X times at 25 °C and 50% RH. Cold and damp sites take longer: always check with a carbide hygrometer.

Why point load matters

Floors fail where the weight sits on a small spot

A fridge foot, a stiletto heel, a pallet jack wheel or a loaded trolley puts its whole weight on a few square centimetres. On a weak or badly compacted bed, that spot crushes, the tile above loses support and cracks. Strength and compaction are what stop it.

SCREED X compressive strength (MPa)01020301725301 day7 days28 daysAS 1012.9 · typical Forspec R&D characteristic values
Fridge feetAbout 100 kg on four small pads
Stiletto heelBody weight on a 1 cm² tip
Pallet jackA tonne on two small wheels
  • Compact it hard. Air pockets left in the bed are where it crushes
  • Keep to the thickness rules: 10 mm bonded, 40 mm unbonded, 45 mm floating
  • Fully bonded over a 3 : 2 FORCEM / ACTFLEX 300 slurry, so the slab carries the load with it
Build the kit
Drying & next trade

Lay it today, the next trade is on it tomorrow

2–3 hWalk on itLight foot traffic
12 hTileTiling from 12 hours, per AS 3958.1
24 hUnder 4% moistureMembrane and vinyl once the hygrometer agrees
28 d30 MPaFull design strength

All at 25 °C and 50% RH. Measure moisture with a carbide hygrometer and follow the covering maker's limit.

NCC 2025 · externals are changing

The screed bed over the membrane is on the way out

For Class 2–9 buildings, NCC 2025 changes how roofs, balconies and podiums are built. NSW adopts it from 1 May 2027.

  • Falls go in the structural slab, at least 1 : 80. A screed or tile bed doesn't count as the structural substrate (F1D4).
  • The membrane goes straight on the concrete (F1D7).
  • The finish is fixed to the membrane or self-draining, pedestals included (F1D10).
  • Houses (Class 1) and bathrooms are not affected.
Anything else on an external needs a Performance Solution, backed by evidence. That's where an engineered screed with a published data sheet comes in. Talk to your consultant before you screed an external.

Need help with the build-up? Call our team on (02) 8021 3517.

On site

SCREED X on real jobs

Podiums, roofs and slabs: pumped or mixed on site, laid between rails, compacted and floated. Tap a video to play it.

Bags straight into the screed pump
Pumped, spread and levelled
Compacted and floated by hand
Podium set out with timber screed rails and SCREED X bags on pallets
Podium set out with rails
Laying SCREED X into a bay between rails
Working bay by bay inside the working time
Floating the SCREED X surface
Floated to close the surface
@thewaterproofingshop1 · Kyle Bay

A roof screed at Kyle Bay with SCREED X.

@thewaterproofingshop1 · NCC 2025

Four numbers before the pour: the NCC 2025 balcony rules.

Questions

Before you buy

How much water do I add?

Between 1.2 and 1.4 litres of clean water per 20 kg bag. Put the water in the mixer first, then add the whole bag. Never add more water, and never re-mix mortar that has started to stiffen.

How many bags do I need?

Allow about 20 kg per square metre for every 10 mm of thickness, so one bag covers about 1 m² at 10 mm or 0.25 m² at 40 mm. 20 m² at 40 mm is 80 bags, plus 5 to 10% for waste. Use the calculator on this page.

Is SCREED X self-levelling?

No. It is a semi-dry screed that you compact and float, from 10 to 100 mm. For a thin self-levelling finish over it, use LEVEL X or LEVEL X PRO.

When can I tile, waterproof or lay vinyl?

Foot traffic from 2 to 3 hours and tiling from 12 hours. Membranes and moisture-sensitive floors once residual moisture is under 4%, which SCREED X reaches at 24 hours at 25 °C and 50% RH. Check with a carbide hygrometer first.

What is the minimum thickness?

Bonded 10 mm (5 mm only with the ACTFLEX 300 and FIBRE X mix and written FORSPEC approval). Unbonded 40 mm to AS 3958.1, or 35 mm over FORSPEC membranes with mesh and a 200 micron slip sheet. Floating 45 mm. Maximum 100 mm.

Can I use a cement mixer?

Not a free-fall drum mixer. Use a forced-action pan mixer, a screed mixer or a high-torque paddle mixer such as the Makinex MS-20, and mix for 3 to 4 minutes.

What is the enhanced mix?

For better bond and water resistance, swap the water for a 2 : 1 blend of water and ACTFLEX 300: 800 mL of water and 400 mL of ACTFLEX 300 per bag. It is also what makes 5 mm bonded screeds possible, with FIBRE X and written FORSPEC approval.

Can it go over underfloor heating?

Yes. Screeds that include underfloor heating systems are one of the uses on the data sheet.

Is it tested?

The values on this page are typical Forspec R&D characteristic values to AS 1012.9 and AS 1012.11, with an indicative EN 13813 designation of CT-C30-F5. Test reports are available on request: call (02) 8021 3517.

Tile tomorrow, not next month

SCREED X 20 kg · $24 a bag · In stock

Build the kit